[Swift-devel] Cant get auto-coasters to run from midway to beagle
Michael Wilde
wilde at mcs.anl.gov
Sat Mar 9 15:46:36 CST 2013
Mihael, can you advise on this problem?
David and I are trying to run automatic coaster jobs from midway login hosts and swift.rcc to beagle using ssh-cl:pbs.
My failed attempts are on midway under /home/wilde/osgdemo/modis/svn, see eg run020 (which has complete logs).
Quick question about the proxy files that get copied. Does this look OK? :
2013-03-09 21:24:46,895+0000 INFO AutoCA Checking certificate /home/wilde/.globus/coasters/proxy.0.pem
2013-03-09 21:24:46,967+0000 INFO AutoCA Using certificate /home/wilde/.globus/coasters/proxy.0.pem with expiration date Sat Mar 23\
19:25:53 GMT 2013
The proxy expiration time listed above is two hours *earlier* than the current time (as seen in the message's UTC timestamp). Is that correct, or a possible cause of this problem?
The main symptom seems to be this:
Execution failed:
Exception in getlanduse:
Arguments: [../data/modis/2002/h00v09.rgb]
Host: beagle
Directory: modis01-20130309-2124-7ua3bde3/jobs/d/getlanduse-d24rhd6l
Caused by:
Could not submit job
Caused by:
Could not start coaster service
Caused by:
Task ended before registration was received.
Failed to download bootstrap jar from http://midway001.rcc.uchicago.edu:50001
---
Yet Ive verified that midway login4 (which is the target system) can connect to this hostname and port (with nc -l and telnet)
- Mike
--
Michael Wilde
Computation Institute, University of Chicago
Mathematics and Computer Science Division
Argonne National Laboratory
More information about the Swift-devel
mailing list