[Swift-devel] Re: scheduler changes to deal with fast-failing sites
    Ben Clifford 
    benc at hawaga.org.uk
       
    Wed Jun 25 17:16:52 CDT 2008
    
    
  
> select site from them based on their scores/Tscores. If the 
> site fails, we could designate it as "frozen", at least for 
> the current job, avoiding more retries would be eaten up. A 
> frozen site could be unfrozen for satisfying different 
> conditions, such as an amount of time later,
That is basically what the patch that I sent does.
-- 
    
    
More information about the Swift-devel
mailing list