On Sun, 6 Jul 2008, Mihael Hategan wrote: > I think it's overall a better strategy. If you prefer throughput to restartability. > Because the stageouts can than > run in parallel with the other jobs as opposed to the other jobs > blocking for the previous stageouts to complete. --