<br><div class="gmail_quote">no not always the best choice..only when data on which the job is dependent are of large size ...<br><br>The situation is bad when the jobs require long processing time.. in such cases it has to be decided what takes less overall time .. scheduling to new resources (and data is fetched there)... on scheduling on the resource with data..<div>

<div></div><div class="h5"><br>
<br><div class="gmail_quote">On Sat, Mar 20, 2010 at 2:09 AM, Mihael Hategan <span dir="ltr"><<a href="mailto:hategan@mcs.anl.gov" target="_blank">hategan@mcs.anl.gov</a>></span> wrote:<br><blockquote class="gmail_quote" style="margin: 0pt 0pt 0pt 0.8ex; border-left: 1px solid rgb(204, 204, 204); padding-left: 1ex;">


<div>On Sat, 2010-03-20 at 01:57 +0530, Vipul Kumar Singh wrote:<br>
>                (iii) When scheduling new jobs, the scheduler looks<br>
> through the hash and schedules new job to the resource that has data<br>
> on which new job is dependent (If the resource is not already<br>
> overloaded).<br>
<br>
</div>Is that always the best choice?<br>
<font color="#888888"><br>
Mihael<br>
<br>
</font></blockquote></div><br>
</div></div></div><br>